Highfield station
Preceding station | CTrain | Following station | ||
---|---|---|---|---|
26 Avenue SE toward Eau Claire | Green Line (phase 1) | Lynnwood/Millican toward Shepard |
Highfield station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one.[1] The station is located in Calgary's oldest industrial area.
The station will be at-grade, parallel to the existing freight railway tracks, and will have a bus loop. The station is expected to stimulate growth of the industrial park, because of increased transit connections for workers. The area has been identified by the City of Calgary to potentially become a generator for new commercial and high tech incubator development.[2]
References
- v
- t
- e
CTrain lines and stations | |||||||
---|---|---|---|---|---|---|---|
Red Line |
| ||||||
Blue Line |
| ||||||
Green Line | |||||||
Former stations |
MAX |
|
---|
- Italics indicate a future line or station
- ■ ■ ■ ■ ■ ■ ■ indicate connections
- Downtown stations form the 7th Avenue Free Fare Zone
This article about a railway station in Alberta is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e